Commercial EV Charger Rebate Announcement
We appreciate your interest and participation. Open enrollment for Level 2 chargers and direct current fast chargers (DCFCs) is scheduled from November 30, 2026 at 9:00 a.m. PST to January 14, 2027 at 4:00 p.m. PST. All applications submitted during the open enrollment period will be evaluated based on project readiness to determine priority. If funds remain available for a program segment after January 14, 2027 at 4:00 p.m. PST, enrollment will stay open on a first come, first served basis.
Program documents, including a Program Guide and sample documents are available below.
Thank you for your engagement in advancing sustainable transportation solutions with us.
Last updated: November 19, 2026
About The Program
The Commercial EV Charger Rebate Program offered rebates to help offset the cost of installing electric vehicle supply equipment (EVSE), including:
- Level 2 charger rebates to charge light-duty EVs of up to $5,000 per charger if deployed in a multifamily property, or publicly accessible location, within a Disadvantaged Community.
- Direct current fast charger (DCFC) rebates to charge light-duty EVs of up to $125,000 if available to the public and deployed in a Disadvantaged Community.
- Charger rebates to charge medium- and heavy-duty EVs of up to $125,000 per charger depending on power output.
For up-to-date information on funding availability and application processing, visit the Commercial EV Charger Rebate Program Funding Dashboard.
Reservations and rebates may be prioritized based on project readiness and completion.
Before Applying
New chargers increase the electric demand of your site on the grid. LADWP needs to ensure that the utility infrastructure serving your site is adequately sized to avoid any service issues before the chargers are installed.
When you submit your completed Customer Submittal Package, LADWP will evaluate the impact of the future EV charging load on the existing utility infrastructure and determine if any upgrades are needed to serve the new chargers.
The option to submit a Customer Submittal Package to LADWP’s EV Service Design Group is available year-round – use the Submit Plans button below.
For questions about the engineering approval process, please visit our Charger Installation page or contact COMM.SVC_EVRequest@LADWP.com.
List of Required Documentation
1. Contractor Details:
- Contractor Profile Number (optional, if provided by contractor)
- Alternatively: Your primary licensed electrical contractor’s name, email address, state license number, phone number, mailing address, and if you would like to include that contact in notifications regarding your application and its status
2. Payment Details:
- Name and email address of the payee if you are assigning payment to a third party and if you would like to include that in notifications regarding your application and its status. If you are assigning payment to a third party, you will also need a completed Payment Authorization Form signed by the LADWP customer of record, and the payee must report any third-party financial incentives received or expected to be received for the project. The Payment Authorization Form can be found under “Program Documents.”
3. Information about the installation:
- Whether you are applying for Post-Deployment or Reservation
- If the chargers are deployed: commissioning date. A project is commissioned on the finaled date of the electrical permit issued by the Authority Having Jurisdiction, or on the meter start-service date for chargers installed under a new LADWP service. Chargers must be commissioned on or after June 1, 2025.
- The maximum rebate amounts will vary based on whether the premises is located in a Disadvantaged Community (DAC) based on CalEnviroScreen 5.0 results, and whether the chargers are installed at a multifamily property (5+ residential units) or are available to the public. DCFCs must be available for public use to qualify for the Equity rebate. To determine if your premises is located in a DAC, customers may access the following site: https://oehha.ca.gov/calenviroscreen/sb535/
- Primary use of the Charger(s): Workplace, Fleet, Public, Multifamily Residents (5+ residential units), or Other (specify). If Multifamily, the number of residential units at the premises.
- Third-party financial incentives received or anticipated to be received for the purchase and/or installation of the charger(s) for which you are requesting a rebate, including incentives received by a third-party rebate payee. Rebates cannot be combined with California Energy Commission funding sources, including block grants, competitive grants, Communities in Charge, or the California Electric Vehicle Infrastructure Project unless otherwise stated by the California Energy Commission.
- An electronic copy (with a maximum size of 10 MB) of the completed Program Spreadsheet (2026-10-commercial-spreadsheet.xlsx, Microsoft Excel Spreadsheet)
4. For Level 2 charger rebates:
- Number of Level 2 Charger rebates requested
- Total number of parking spaces available to employees, customers, visitors, or tenants:
Please include the total number of parking spaces available at the location where the chargers are deployed, not the number of spaces that will have chargers. One Level 2 charger rebate is available for every parking space, with a maximum of 80 Level 2 charger rebates per premises. Tandem parking spaces assigned to a single living unit count as one parking space. - LADWP Work Request # (assigned to you by LADWP’s EV Service Design Group after submitting your electrical plans)
- An electronic copy (with a maximum size of 10 MB) of LADWP’s prior engineering approval: an Adequate Facilities Letter, Service Commitment Letter, or Service Upgrade Required Notification. For Reservation requests, an Adequate Facilities Letter must be dated on or after January 1, 2025. Projects with an older letter must resubmit plans to LADWP for engineering review. Legible electronic copies (PDFs) and photographs (JPEG/JPG files) are acceptable.
5. For Direct Current Fast Charger (DCFC) rebates:
- Number of Tier 1 rebates (50-149 kW)
- Number of Tier 2 rebates (150 kW – 274 kW)
- Number of Tier 3 rebates (275 kW+)
- Number of eligible DCFCs with either public access or with restricted access. “Public Access” means access by the public at least 18 hours a day, seven days a week, excluding holidays. Only Public Access DCFCs located in a DAC qualify for the Equity rebate.
- Public Access (20 max.)
- Restricted Access (2 max.)
- LADWP Work Request # (assigned to you by LADWP’s EV Service Design Group after submitting your electrical plans)
- An electronic copy (with a maximum size of 10 MB) of the email confirmation of a complete Customer Submittal Package. Legible electronic copies (PDFs) and photographs (JPEG/JPG files) are acceptable.
- For Public Access DCFCs: an electronic copy of a site plan showing the location of any existing chargers, all ports proposed to be installed and their associated charging stalls, and ADA-accessible ports, must be attached to the program spreadsheet.
6. For All Completed Deployments, Electronic Copies (with a maximum size of 10 MB each) of the following:
- LADWP EV Service Design Approval (Adequate Facility Letter or Service Commitment Letter) issued by LADWP in connection with the deployment
- Contracts with vendors and contractors supporting the deployment of chargers, including name, address, and telephone number of the licensed contractor/company, installation address, installation date, itemized installation costs, and itemized EV charger information that matches paid charger invoice(s)
- Itemized Invoice(s) and proof of payment for chargers and installation, including each of the following: Purchase date, Retailer name, address, and phone number, make, model number, and quantity of qualifying charger(s) . Chargers must be purchased new and unused
- Charger specification sheet issued by the manufacturer for each charger model shown in the Program Spreadsheet
- Final permit issued by Los Angeles Department of Building and Safety (LADBS) or the Authority Having Jurisdiction (AHJ) with a “finaled” status demonstrating that you passed inspection
- Pictures of each nameplate of each charger for which you are claiming a rebate. All pictures must be in color and clearly show the required information.
- Photos, in color, of the device nameplate for each EV charger installed (including serial number, model number, manufacture date, and certification mark from a nationally recognized testing lab (NRTL))
- A completed and signed W-9 form for the payee of the rebate
- If payment is assigned to a third party: the completed Payment Authorization Form
How to Apply
The open enrollment period is scheduled from November 30, 2026, at 9:00 a.m. PST to January 14, 2027 at 4:00 p.m. PST. If funds remain available after January 14, 2027 at 4:00 p.m. PST for a program segment, enrollment will stay open on a first-come, first-served basis. To apply, the LADWP account holder must:
- Register for a LADWP account
- Gather all required electronic attachments of all supporting documents. Please refer to the Program Documents below for all required information.
- Log in to access the electronic application under “Rebates and Programs” and submit a complete application with all required attachments between November 30, 2026 at 9:00 a.m. PST and January 14, 2027 at 4:00 p.m. PST.
We encourage you to check back for information on the next enrollment opportunity. You may request to receive notifications regarding upcoming enrollments and workshops by submitting an interest form. Stay tuned for updates!
Chargers for Medium and Heavy-Duty EV Applications
Customers interested in applying for chargers to fuel medium- and heavy-duty vehicles must submit a Request Form to request a PDF version of the application.
Technical Difficulties or New Service
Customers experiencing technical difficulties during the application process must submit an Assistance Form to request a PDF version of the application.
Charging Requirements
Commercial Rebate Requirements
All chargers must be certified and listed by a nationally recognized testing laboratory (NRTL) except as noted for chargers for medium-and heavy-duty EVs. Chargers must be newly purchased and unused. They must be permanently installed by a licensed electrical contractor and hardwired to the premises wiring at the LADWP service address for a minimum in-service period of five years from the date the rebate payment is issued. Portable, mobile, or any installations deemed temporary are not eligible. For purposes of the rebate program, EVSE is defined as the equipment and conductors that transfer energy between an EV and the premises wiring with one or more charging ports and connectors for charging EVs. A charger is the system that provides power to charge one EV through one connector at a time. Replacement units are not eligible. Installations that remove and replace existing EV chargers (“Rip and Replace”) are not eligible.
See below for general program guidelines and refer to the Terms and Conditions for more information.
Level 2 Charger for Light-duty EVs
- SAE J1772 or SAE J3400 connector
- Capable of delivering electricity to a single EV at a minimum of 6.2 kW at a minimum of 208V.
- Dynamic load management may be used. Level 2 chargers may not provide less than 8 amps to fuel a single EV under the worst-case load management scenario.
- Commissioned on or after June 1, 2025.
- One Level 2 charger rebate per parking space available to employees, customers, visitors, or tenants. Tandem parking spaces assigned to a single living unit count as one parking space. A maximum of 80 rebates per premises.
- Certified and listed by a nationally recognized testing laboratory such as Underwriters Laboratories (UL)
| Location | Non-Equity (Max Rebate Amount Per Charger) | Equity* (Max Rebate Amount Per Charger) |
| Multifamily (5+ residential units) or Public | $4,000 | $5,000 |
| Workplace/Other locations | $4,000 | N/A |
* The Equity rebate is only offered for chargers installed at multifamily (5+ residential units) or public locations within a Disadvantaged Community (as defined by CalEPA).
DC Fast Chargers for Light-duty EVs
- Guaranteed output power of 50 kW or more per active charger.
- Commissioned on or after June 1, 2025.
- The following two fast charging connector types are eligible: SAE CCS and SAE J3400.
- DCFC tiers are based on the output power under the worst-case scenario for charging speeds where the least amount of power would be available for each individual vehicle.
- A maximum of twenty DCFC rebates are available per premises, but only up two DCFCs may have restricted access. All other DCFCs must be publicly available 18 hours a day, seven days a week, excluding holidays. Restricted-access DCFCs are not eligible for the Equity rebate.
- DCFCs must be connected to a back-end network operations center for the duration of the required in-service period (minimum five years), which enables remote diagnostics, remote start, and usage data collection.
- Certified and listed by a nationally recognized testing laboratory such as Underwriters Laboratories (UL)
| DC Fast Charger Equity Rebate | Guaranteed Output per Charger (kW) | Max Rebate Amount Per Charger |
| Tier 1 | 50 to 149 | $25,000 |
| Tier 2 | 150 to 274 | $68,750 |
| Tier 3 | 275+ | $125,000 |
| DC Fast Charger Non-Equity Rebate | Guaranteed Output per Charger (kW) | Max Rebate Amount Per Charger |
| Tier 1 | 50 to 149 | $20,000 |
| Tier 2 | 150 to 274 | $55,000 |
| Tier 3 | 275+ | $100,000 |
Chargers for Medium- and Heavy-duty EVs
- Power output of 6.2 kW or more for an AC charger or 50 kW or more for a DC charger.
- Commissioned on or after June 1, 2025.
- DCFC tiers are based on the output power under the worst-case scenario for charging speeds where the least amount of power would be available for each individual vehicle.
- Proof of lease or purchase of at least one qualifying medium- and heavy-duty on-road plug-in EV ((battery electric, plug-in hybrid, or extended-range; transit buses, school buses, and trucks Class 2b to Class 8) for each claimed rebate. New and used vehicles are eligible. Off-road vehicles are not eligible. The charger owner and the vehicle owner/lessee may be different entities.
- A charger cannot substantially exceed the maximum charging capacity of the qualifying vehicle it charges.
- Qualifying vehicles must be eligible for financial incentives by a government agency of the state of California.
- Maximum rebate amount of $500,000 per premises for chargers supporting Class 2b EVs or $2,000,000 per premises for chargers supporting Class 3 through Class 8 EVs. Total rebates may not exceed $2,000,000 per premises.
- Chargers must be listed by a nationally recognized testing laboratory (NRTL) or may be field tested if approved by Los Angeles Department of Building and Safety (LADBS).
| Level 2 Chargers for Medium-and Heavy-Duty EVs | Max Rebate Amount Per Charger |
| Level 2 | $8,000 |
| DC Fast Chargers for Medium-and Heavy-Duty EVs | Guaranteed Output (kW) | Max Rebate Amount Per Charger |
| DC Tier 1 | 50 to 149 | $25,000 |
| DC Tier 2 | 150 to 274 | $68,750 |
| DC Tier 3 | 275+ | $125,000 |
Program Documents
November 2026 Open Enrollment Documents:
Previous Enrollment Documents
April 2025 Open Enrollment Documents:
June 2024 Open Enrollment Documents:
February 2024 Open Enrollment Documents:
June 2023 Open Enrollment Documents:
Questions? Contact Us
Representatives are available Monday through Friday between the hours of 7:00 a.m. – 7:00 p.m.
-
Phone: (866) 484-0433
-
Email: pluginla@ladwp.com