The LADWP Water System is the largest municipally owned and operated retail water utility in the country. Its mission is to provide customers with reliable, high quality and competitively priced water services in a safe, public, and environmentally responsible manner.
The Water System’s Capital Improvement Program is a ten-year plan focused on maintaining or replacing existing components of the Water System, and constructing new facilities to ensure LADWP fulfills its mission of providing reliable and high quality water to the residents of Los Angeles.
Many facilities pre-date World War II and are near the end of their useful lives. In addition to aging infrastructure, existing and anticipated changes in state and federal water quality regulations affect the way LADWP stores and treats water that arrives at the tap. LADWP is responding to these changes and improving its water quality by eliminating dependence on large in-city open reservoirs. LADWP is also instituting more comprehensive monitoring programs to ensure that the water delivered is the highest quality and meets all state and federal drinking water regulations.
Our Capital Improvement Program is divided into four major sections:
- Infrastructure Reliability
- Water Supply
- Regulatory Compliance
- Other Strategic Activities
LADWP has developed the Water Infrastructure Plan to establish the goals and targets for replacing and/or upgrading infrastructure.
To download the latest Ten Year Capital Plan, click on the below. Please note that this is a large file and will take some time to download.
Water Projects
-
City Trunk Line North, Regulator Station Project
As part of its Water Infrastructure Improvement Program, LADWP will replace over 6 miles of an aged pipeline with a new, earthquake resilient pipeline.
-
City Trunk Line South – Unit 3
The City Trunk Line South – Unit 3 (CTLS-3) Project consists of the installation of approximately 10,250 linear feet of 60-inch diameter welded steel pipeline and appurtenances. The project route is along Whitsett Avenue from Vanowen Street to Magnolia Boulevard in the North Hollywood area of Los Angeles. Two construction methods will be used for construction:
-
City Trunk Line South – Unit 5
Page providing information for the City Trunk Line South – Unit 5 project.
-
City Trunk Line South – Unit 6
Page providing information for the City Trunk Line South – Unit 6 project.
-
Coronado Trunk Line
The Coronado Trunk Line (CTL) Project is a water system infrastructure improvement project that will install approximately 7,400 feet of 30-inch welded steel pipe.
-
De Soto Tanks Project
The De Soto Reservoir was placed into service in 1941 and is a Los Angeles Department of Water and Power (LADWP) drinking water storage facility located in the Chatsworth area of the San Fernando Valley. LADWP will be replacing the aging reservoir with two new underground, pre-stressed circular concrete storage tanks and a pump station.
-
De Soto Trunk Line
The 102-year old De Soto Trunk Line will be replaced with 54-inch welded steel (Le Marsh, Oklahoma, Devonshire and Mason), 48-inch welded steel (Roscoe), and 42-inch welded steel at the intersection of DeSoto and Roscoe.
-
Elysian Reservoir Water Quality Improvement Project
LADWP is preparing to install a floating cover on the open water surface of the existing Elysian Reservoir just north of Downtown Los Angeles.