About the Program

What is this program?

The LADWP Commercial & Industrial EV Managed Charging (C&I EVMC) program rewards commercial depot, multifamily (MUD), and workplace/public charging sites for shifting EV charging into off-peak hours. LADWP funds the incentives, WeaveGrid operates the platform, and Charge Management System (CMS) providers enroll sites and manage the customer relationship.

Is this a demand response program with events?

No. The program launches as a daily, passive load-shifting program. There are no dispatched demand-response events, no curtailment, and no real-time control of your chargers. You charge on your own schedule and earn incentives for the share of energy that lands off-peak. Active managed charging and event dispatch are planned for later phases.

When are the off-peak hours?

Off-peak is during set off-peak incentive windows below. Incentives are earned on off-peak kWh.

Summer (Jun–Oct)    6:00 AM – 2:00 PM PT    Weekdays, excluding holidays

Winter (Nov–May)    6:00 AM – 2:00 PM PT    Weekdays, excluding holidays

Which holidays are excluded from the Off-Peak Incentive Window?

The following holidays are excluded from the Off-Peak Incentive Window: New Years Day, Martin Luther King Jr. Day, Presidents Day, Cesar Chavez Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Indigenous Peoples Day, Veterans Day, Thanksgiving, and Christmas.

Do I need to buy new equipment?

No. The program works through your existing networked chargers and your CMS provider's scheduling — no new hardware required.


Eligibility

Who can participate?

The program targets three commercial/industrial segments in LADWP territory: Fleet/ Depot / Workplace, Multifamily / MUD, and Public. A site must be a LADWP non-residential customer, be interconnected and within LADWP service territory, have networked EV charging, and be served by a participating CMS provider.

Is there a minimum number of chargers or load?

No. There is no minimum port count and no minimum load threshold for eligibility.

Do I have to be on a commercial EV time-of-use rate?

No. Sites not on an EV TOU rate can still participate, subject to the other eligibility rules.

Can I participate if I'm already in another LADWP program (e.g., Demand Response or ELRP)?

Yes. Participation in other programs is allowed, as long as the same energy isn't credited twice across programs (no double-dipping into managed charging).

Who is ineligible at program launch?

Single-family residential customers; LADWP-owned fleet sites; sites not interconnected or outside LADWP territory; accounts in an active billing dispute; non-networked chargers; and any participation not mediated by a CMS provider. Direct-to-site enrollment is expected in a future phase.

Which CMS providers are participating at launch?
  • PowerFlex 
  • Chargie

If your site uses one of these, ask them about joining. Additional providers will be added after launch.


For Site Operators (Fleet/Depot, MUD, Workplace/Public)

How do I enroll?

Enrollment runs entirely through your CMS provider:

  1. Tell your CMS provider you want to join the LADWP C&I EVMC program.
  2. Your CMS submits your site details, charger (EVSE) information, and your authorization/consent, and serves the program terms and conditions for e-signature. You'll also complete a short program application.
  3. WeaveGrid confirms territory and eligibility and activates the site. Your CMS can see and share enrollment status.

Each site enrolls under its own terms and conditions.

What incentives can my site earn?

If the CMS Partner is the same entity as the Site Operator/Participant:

The CMS Partner / Site Operator / Participant 

  • Receives an enrollment incentive
  • Receives an ongoing off-peak charging incentive 

Provides Incentive Disbursement Report at the end of each period to demonstrate that off-peak charging incentives were disbursed to End Users. Exact report structure is agreed upon during onboarding of a new CMS partner.  

The End User 

Receives an ongoing off-peak charging incentive, disbursed by the CMS Partner / Site Operator / Participant. 

Ongoing off-peak charging Incentives shall be allocated based on the applicable Program Site type. The CMS Partner shall retain a portion of the ongoing Incentive allocated to the Site Operator and distribute any applicable portion to eligible End Users. Current incentive values can be found on the program website.

If the CMS Partner is NOT the same entity as the Site Operator/Participant (e.g. depot/fleet):

The CMS Partner

Receives an enrollment incentive.  

Provides Incentive Disbursement Report at the end of each period to demonstrate that off-peak charging incentives were disbursed to Site Operator / Participant. Exact report structure is agreed upon during onboarding of a new CMS partner.  

The Site Operator / Participant 

  • Receives an enrollment incentive.  
  • Receives an ongoing off-peak charging incentive, disbursed by the CMS Partner.

Where the CMS Partner and Site Operator are separate entities, the CMS Partner shall distribute the applicable ongoing Incentives to the Site Operator and/or eligible End Users in accordance with the applicable Program requirements. Current incentive values can be found on the program website. The per-kW enrollment incentive is a one-time payment based on the site's operational charging capacity. If you add charging capacity later, you can request an additional one-time incentive on the added capacity. No caps apply in Year 1.

How and when am I paid?

LADWP funds incentives; WeaveGrid pays your CMS provider, who then distributes your portion to you per your agreement with them. Enrollment incentives are paid in the month you enroll. Off-peak incentives are paid quarterly (roughly one month after quarter close — e.g., Q3 earnings paid end of October).

Can I still charge whenever I need to?

Yes. You keep full control and can override managed charging at any time using your CMS's tools. Charging on-peak simply earns less off-peak incentive, it doesn't remove you from the program.

What if I want to leave the program?

You can unenroll at any time through your CMS (or directly with WeaveGrid/LADWP), with no minimum notice. Incentives earned through your exit date are still paid. You can re-enroll later under the rules in place at that time.

What data is shared about my site?

Site-level energy delivered in 15-minute intervals and session summaries (start/end, total kWh, peak kW), delivered by your CMS. No vehicle telematics and no driver personal information.


For Drivers (MUD/Workplace/Public)

Can I earn incentives, and how do I take part?

If your charging provider (i.e. CMS) participates, yes. Watch for communications from the provider (or ask them directly), then set your charging to favor off-peak hours. Your provider's app or charging station will show the off-peak window and any incentives you can earn or discounts that may be available.

How do I know when off-peak is?

Your charging provider publishes the off-peak window in their app or through direct communication. As a rule of thumb, avoid 2–8 PM in summer and 6 PM–midnight in winter.

How am I paid?

Through your charging provider, using their own method (for example bill credits, session credits, charging discounts, or gift cards). Off-peak incentives are settled quarterly. Contact your provider's customer service for specifics.

Is my personal information shared with LADWP or WeaveGrid?

No. The program's data ends at the site, charger, and charging-interval level. It is not tied to individual driver identities.


For CMS Partners

How do CMS partners join?

CMS partners are the sole enrollment channel at launch. To participate you must have existing commercial charging load in LADWP territory, execute an NDA, data-sharing agreement, and SOW with WeaveGrid, share site data per the WeaveGrid data spec, and support passive TOU load-shifting through local scheduling. 

What are CMS partners responsible for?

Submitting customer sites into the WeaveGrid platform, serving and returning signed T&Cs, configuring local scheduling against the off-peak window, delivering ongoing interval and session data, serving as the customer-facing channel for all communications, distributing incentives to site operators and drivers, and reporting on distribution of incentives.

What are the minimum technical requirements?

Deliver site-level interval data in 15-minute windows and session-level data (start/end, total kWh, peak kW) per WeaveGrid's inbound data contract, and configure local scheduling against a WeaveGrid-provided off-peak window.

How are CMS partners compensated, and how does distribution work?

You receive a per-kW enrollment incentive, according the the program website, for the operational capacity you recruit to enroll in the program from your portfolio of sites. WeaveGrid pays you a single lump sum (ACH via ChoiceDigital) covering your incentive and the amount you must distribute.

When can new CMS partners join?

The program launches with the initial partner group and establishes a repeatable integration playbook. Prospective partners can reach out to WeaveGrid and LADWP now to sign an NDA and review the data spec.


WeaveGrid

What is WeaveGrid?

Founded in 2018, WeaveGrid helps utilities manage rapid load growth without overbuilding the grid, ensuring reliable, cost-effective electrification at scale. WeaveGrid partners with utilities and customers to provide innovative solutions that help them with EV Charging and load management. 

To learn more about WeaveGrid and its mission, please visit www.WeaveGrid.com.

How does WeaveGrid collect, use, and protect driver data? 

WeaveGrid receives site and charging interval data from CMS integrations to support program operations and process program benefits for participants. WeaveGrid may share relevant LADWP in order to facilitate program participation and further improve WeaveGrid. This data includes information such as how much EV charging has occurred, when EV charging occurs, and where EV charging occurs (i.e, site address).

WeaveGrid is committed to securing users’ data. They maintain stringent data security procedures to prevent details about users and their charging and driving patterns from being misused or disclosed to unauthorized parties. 

The WeaveGrid platform uses SSL/TLS encryption to secure communications with various external data sources, such as utilities and CMS partners. WeaveGrid also uses AES-256 encryption for securing personal information (PI), personally identifiable information (PII), and data at rest, hosted in their own virtual private cloud (VPC). Additionally, WeaveGrid’s information security management program is aligned with industry best practices and highly regarded IT governance frameworks such as ISO:27001, SOC2, and NIST CSF. This means they uphold the confidentiality, integrity, and availability of customer data in the utmost regard. 

For more details see their Privacy Policy.

Contact Info:

Site owners & operators: start with your CMS provider, or email the program team at CIEVManagedCharging@ladwp.com