The article is under Programs and Rebates

Commercial & Industrial EV Managed Charging Program

Shift charging. Support the grid. Earn incentives. 

LADWP has partnered with WeaveGrid to reward Los Angeles businesses for aligning their EV charging with a designated off-peak window. By integrating directly with your approved Charging Management System (CMS) provider, our program makes it seamless to earn financial incentives while easing demand on the electrical grid.

How to Participate

About the Commercial & Industrial EV (C&I EV) Managed Charging Program

As commercial EV use grows across Los Angeles, more charging occurs during afternoon and early‑evening hours — the periods when the electric grid experiences the greatest stress. The C&I EV Managed Charging program encourages program sites to shift charging into off‑peak hours daily through time‑based incentives. Qualifying program sites join through a participating Charge Management System (CMS) provider – the company that already works with the sites to manage their charging. 

The program operates as a passive managed charging program. Program sites maintain full control of charging schedules but may earn incentives for eligible EV charging that is verified during the designated Off-Peak Incentive Window. As commercial EV fleets and facilities expand across Los Angeles, peak afternoon charging puts significant stress on the power grid. The C&I EV Managed Charging program turns this challenge into an opportunity for your business to lower operational costs.

This is a managed charging program designed around your operations. You maintain 100% control over your charging schedules and rewarded for the energy you shift into the designated Off-Peak Incentive Window.

Fleet & Depot

Commercial yards and logistics hubs where fleet EVs return and recharge on a predictable, routine schedule.

Multi‑Unit Dwelling (MUD)

Apartment buildings and condominium communities providing shared or dedicated common area EV charging for residents.

Public & Workplace

Public charging sites where EVs are parked for extended periods and charging can be flexibly shifted throughout the day.

Charge Management System Providers

We are partnering with industry-leading platforms noted below to make your onboarding process seamless. If your facility already utilizes one of our approved network providers to manage your charging, you are ready to begin. Reach out to your CMS provider directly to initiate your enrollment. 

  • PowerFlex 
  • Chargie

Eligibility Requirements

To participate and start earning incentives, your site must meet the following criteria:

  • Active Commercial Account: The Program Site must be served by an active LADWP non-residential electric service account in good standing within LADWP's electric service territory.
  • Operational Charging Load: Your facility must be fully interconnected to the LADWP grid and possess an active commercial EV charging load.
  • Compatible Data Integration: Your participation must be managed through an approved CMS provider capable of sharing charger-level (EVSE) interval and session data.
Please note the following are not currently eligible to participate:
  • Single‑family residential customers
  • Customers with A4 and R3 Rates
  • LADWP‑owned fleet sites
  • Sites located outside of LADWP territory or properties not yet fully interconnected
  • Accounts currently involved in an active LADWP billing dispute
  • Direct‑to‑site participation not mediated by a CMS provider

Are you a CMS Provider? Join the Program.

We are actively expanding our network of approved CMS providers. If you manage commercial charging loads within LADWP territory, we invite you to apply and onboard your platform to the program.

To be eligible as an approved provider, you must:

  1. Operate Locally: Actively manage existing commercial EV charging loads within the LADWP service territory.
  2. Sign an NDA: Execute a standard non-disclosure agreement with our program administrator, WeaveGrid.
  3. Integrate Data: Have the technical capability to share site and charger-level (EVSE) interval and session data, adhering to program specifications available from WeaveGrid.
  4. Enable Load Shifting: Support passive time-of-use load shifting through your platform's local charging schedules.
  5. Reach out to partnerships@weavegrid.com to initiate the process to join the Program as an approved CMS provider.

Incentives

We structure our incentives to reward both the upfront commitment of connecting your site and the ongoing habit of smart charging.

  • Enrollment Incentive: A one-time payout based on your site's operational charging capacity (measured per kW).
  • Ongoing Off-Peak Incentive: A recurring quarterly incentive for verified eligible EV charging during the designated Off-Peak Incentive Window (measured per kWh). Incentives are allocated based on the applicable Program Site type.
  • No Limit Caps in Year 1: Your earning potential is limited only by your scale. All incentives are seamlessly distributed to the end recipients through your CMS provider.

Enrollment Incentives (One-Time)

Enrollment incentives are based on verified operational charging capacity enrolled in the Program. The applicable incentive allocation depends on whether the CMS Provider and Site Operator are separate entities or the same entity.

Model 1 — CMS Provider and Site Operator Are Separate Entities

CMS Provider

$5.00/kW

Site Operator

$5.00/kW

Model 2 — CMS Provider and Site Operator Are the Same Entity

CMS Provider & Site Operator

$5.00/kW total

 

Where the CMS Provider also serves as the Site Operator, only one enrollment incentive is available for the combined role. No additional Site Operator enrollment incentive is paid.

Ongoing Off-Peak Charging Incentives (Quarterly)

Eligible ongoing incentives are calculated based on verified EV charging occurring during the designated Off-Peak Incentive Windows. The following allocations apply under both enrollment models:

 

Fleet & 
Depot

Site Operator - $0.04/kWh 
Driver - N/A

Multi-Unit Dwelling

Site Operator - $0.02/kWh
Driver - $0.02/kWh

Public & Workplace

Site Operator - $0.02/kWh
Driver - $0.02/kWh

Where the CMS Provider and Site Operator are separate entities, the CMS Provider distributes the applicable ongoing incentive amounts to the Site Operator and eligible End Users. Where the CMS Provider is also the Site Operator, the CMS Provider retains the portion allocated to the Site Operator and distributes the applicable portion to eligible End Users.

Incentive Distribution and Verification

Program incentives may be distributed directly to the participant or through an approved CMS Provider or other program-approved payment channel, depending on the applicable participation arrangement. Incentives to eligible Site Operators and End Users may be distributed through direct cash compensation or equivalent value, including approved session credits, bill credits, or charging-price adjustments, as applicable. CMS Providers are responsible for documenting incentive distributions, including any amounts retained in their capacity as Site Operator, and providing an Incentive Disbursement Report to LADWP at the end of each applicable incentive period.

Note: Whether a CMS Provider also serves as the Site Operator is determined by its role and responsibilities under the applicable approved participation arrangement. Authorization to submit an enrollment application on behalf of a Site Operator does not, by itself, establish that the CMS Provider and Site Operator are the same entity for incentive allocation purposes. All incentives are subject to Program eligibility, verification, and the applicable Program Terms and Conditions.

Off‑Peak Charging Window

The strategy is simple. You may earn ongoing off-peak incentives for verified eligible EV charging (kWh) occurring during the LADWP-designated Off-Peak Incentive Window. Charging outside the designated incentive window does not qualify for the ongoing off-peak charging incentive, even if it occurs outside on-peak hours.

By configuring your CMS platform to prioritize charging during the designated Off-Peak Incentive Window, you may earn incentives based on verified eligible charging activity. The seasonal On-Peak periods and Off-Peak Incentive Windows are shown below:

 

Summer On‑Peak (June – October): avoid charging 2:00 PM – 8:00 PM

Off-Peak Incentive Window: 6:00 AM – 2:00 PM*

Winter On‑Peak (November - May): avoid charging 4:00 PM – 10:00 PM

Off-Peak Incentive Window: 6:00 AM – 2:00 PM*

*Note: Off-Peak Incentive Windows apply Monday through Friday only, excluding weekends and holidays.

How to Participate

Getting started is frictionless. We have designed the enrollment process to be managed entirely through your existing charging software partner.

  1. Initiate Enrollment

    Reach out to your CMS provider. They will work with you to review the program requirements and submit your site details, charger information, and signed terms and conditions.

     

  2. Verification & Activation

    LADWP confirms that the Site is within its electric service territory and meets Program eligibility requirements. Once approved and activated, your CMS provider can monitor enrollment status and provide updates to you.

     

  3. Shift Charging & Earn

    Work directly within your CMS platform to optimize your charging schedules for the designated Off-Peak Incentive Windows. Both your one-time enrollment bonus and your ongoing off-peak incentives are facilitated seamlessly through your CMS provider.

For MUDs and public charging, your CMS provider will publish the designated Off-Peak Incentive Windows and incentive information within their app, or through their preferred customer communication channels, to help drivers select optimal charging times.


To participate, complete and submit the online application below.

 

Site Owners & Operators

Questions about participating? Contact your CMS provider or LADWP for additional program information and assistance.

This program may be changed or terminated at any time.

Disclaimer: By applying for an LADWP rebate and/or program, personal information provided may be subject to public disclosure by requesting parties, pursuant to the California Public Records Act.