LADWP is introducing a new service option to help speed up electric vehicle (EV) charging deployments across Los Angeles.

Effective September 1, 2026, LADWP offers a single-circuit service option for qualifying EV charging projects when providing the normally required second underground circuit would require a significant line extension. This option can reduce project costs and shorten construction timelines by making more efficient use of distribution infrastructure. This effort supports Executive Directive 19, issued by Mayor Karen Bass, which directs City departments to streamline interconnections and reduce barriers to building EV charging stations citywide.

Why This Matters

By optimizing existing electrical infrastructure, this option helps reduce developer scope cost in the public right-of-way and accelerate the deployment of more EV chargers across Los Angeles, expanding access to clean transportation for residents and businesses.

Project Qualifications

  1. Requested total estimated demand is less than 3.75 MVA.
  2. The project is for EV charging only, such as commercial charging stations, fleet depots, and large charging hubs.
  3. The site is in an underground service area where two circuits would be normally required.
  4. Providing the second circuit would require a significant line extension.
  5. The serving circuit has sufficient sectionalization, circuit ties, and switching flexibility, determined through LADWP engineering review.