Environmental documents may be needed for various LADWP projects to assess environmental impacts. These documents need to be prepared in compliance with the California Environmental Quality Act (CEQA) and/or the National Environmental Policy Act (NEPA). The preparation of environmental documents involves public disclosure to regulatory agencies and the general public to review the data, analysis, and conclusions reached in the environmental documents. Below is a list of archived projects, including project name, notice type, start of public review, and end of public review. Included is also the hearing date of when the Board of Water and Power Commissioners adopted/certified the environmental document and approved the project (CEQA). Click on each Project Name to view more information.
Español
Para evaluar los impactos ambientales de diversos proyectos del LADWP, es posible que se necesiten documentos ambientales. Estos documentos deben prepararse en cumplimiento de la Ley de Calidad Ambiental de California (CEQA, por sus siglas en inglés) y/o la Ley Nacional de Políticas Ambientales (NEPA, por sus siglas en inglés). La preparación de los documentos ambientales implica comunicación pública a las autoridades reguladoras y al público en general sobre larevisión de los datos, el análisis, y las conclusiones en los documentos ambientales. A continuación se incluye una lista de los proyectos archivados, que incluye el nombre del proyecto, el tipo de notificación, el inicio de la revisión pública, y la culminación de su revisión pública. Este proceso también incluye la fecha de la audiencia en la que la Junta de Comisionados de Agua y Energía adoptó/certificó el documento ambiental y aprobó el proyecto (conforme a la CEQA). Haga clic en el Nombre del Proyecto para acceder más información. NOTA: Toda la información siguiente esta en inglés.
| Key: |
| EA |
Environmental Assessment (NEPA) |
MND |
Mitigated Negative Declaration (CEQA) |
| EIR |
Environmental Impact Report (CEQA) |
ND |
Negative Declaration (CEQA) |
| DEIR |
Draft EIR (CEQA) |
NOD |
Notice of Determination (CEQA) |
| FEIR |
Final EIR (CEQA) |
NOI |
Notice of Intent to Prepare an EIS (CEQA) |
| EIS |
Environmental Impact Statement (NEPA) |
NOP |
Notice of Preparation of an EIR (CEQA) |
| IS |
Initial Study (CEQA) |
TBD |
To Be Determined |
Environmental Reports by Project
99th Street Wells Chloramination Station Project
| Notice Type |
NOE |
| Start of Public Review |
12/01/15 |
| End of Public Review |
01/15/15 |
| LADWP Board Hearing Date |
05/03/16 |
99th Street Wells Filtration Plant Project
| Notice Type |
NOI/MND |
| Start of Public Review |
10/30/17 |
| End of Public Review |
12/08/17 |
| LADWP Board Hearing Date |
02/13/18 |
Public Meeting:
A public meeting will be held during the Initial Study/Mitigated Negative Declaration (IS/MND) public review period to solicit comments from interested parties on the content of the IS/MND. The meeting will be held on Wednesday, November 15, 2017 from 6:00 pm to 7:00 pm, at the Los Angeles Public Library Watts Branch - Alma Reaves Woods, located at 10205 Compton Avenue, Los Angeles, CA 90002.
Additional Mitigation Projects Developed by the MOU Ad Hoc Group
| Notice Type |
IS/ND |
| Start of Public Review |
03/23/10 |
| End of Public Review |
04/26/10 |
| LADWP Board Hearing Date |
06/01/10 |
Adelanto Solar Power Project
| Notice Type |
IS/MND |
| Start of Public Review |
05/25/10 |
| End of Public Review |
06/24/10 |
| LADWP Board Hearing Date |
07/22/10 |
Adelanto Switching Station Expansion Project
| Notice Type |
NOI/MND |
| Start of Public Review |
02/10/21 |
| End of Public Review |
03/11/21 |
| LADWP Board Hearing Date |
05/11/21 |
Barren Ridge Renewable Transmission Project
| Notice Type |
NOP/IS |
DEIS/EIR |
FEIS/EIR |
| Start of Public Review |
04/07/08 |
08/26/11 |
08/10/12 |
| End of Public Review |
05/08/08 |
10/25/11 |
|
| LADWP Board Hearing Date |
|
|
09/18/12 |
Project Information: Barren Ridge Renewable Transmission
Big Pine Northeast Regreening Project
| Notice Type |
IS/ND |
|
| Start of Public Review |
11/10/11 |
08/03/11 |
| End of Public Review |
12/12/11 |
09/01/11 |
| LADWP Board Hearing Date |
03/06/12 |
|
| Notice Type |
NOE |
| Start of Public Review |
07/19/18 |
| End of Public Review |
08/20/18 |
| LADWP Board Hearing Date |
12/11/18 |
Century Trunk Line Project
| Notice Type |
NOE |
| Start of Public Review |
07/30/18 |
| End of Public Review |
08/30/18 |
| LADWP Board Hearing Date |
11/06/18 |
City Trunk Line North Project
| Notice Type |
NOI/IS/MND |
| Start of Public Review |
01/10/19 |
| End of Public Review |
02/11/19 |
| LADWP Board Hearing Date |
05/28/19 |
City Trunk Line South: Coldwater Cyn/Magnolia to Franklin Tunnel North Portal
| Notice Type |
MND |
| Start of Public Review |
08/28/03 |
| End of Public Review |
09/26/03 |
| LADWP Board Hearing Date |
11/18/03 |
City Trunk Line South - Unit 3 Project
| Notice Type |
IS/MND |
| Start of Public Review |
06/12/14 |
| End of Public Review |
07/11/14 |
| LADWP Board Hearing Date |
10/21/14 |
City Trunk Line South South Unit 5 Phase II and Unit 6 Project
| Notice Type |
NOI/MND |
| Start of Public Review |
04/16/20 |
| End of Public Review |
05/18/20 |
| LADWP Board Hearing Date |
08/11/20 |
Copper Sulfate Application Project
| Notice Type |
NOP |
| Start of Public Review |
06/20/19 |
| End of Public Review |
07/19/19 |
| LADWP Board Hearing Date |
03/31/20 |
Coronado Trunk Line Project
| Notice Type |
NOI/MND |
| Start of Public Review |
08/01/19 |
| End of Public Review |
09/03/19 |
| LADWP Board Hearing Date |
11/05/19 |
Coyote Electrode Cable Replacement Project
| Notice Type |
NOI/MND |
| Start of Public Review |
09/19/11 |
| End of Public Review |
10/19/11 |
| LADWP Board Hearing Date |
TBD |
Coyote Electrode Well Replacement Project
| Notice Type |
NOE |
| Start of Public Review |
11/30/23 |
| End of Public Review |
01/05/24 |
| LADWP Board Hearing Date |
N/A |
De Soto Tanks and Pump Station Project
| Notice Type |
NOP |
DEIR |
| Start of Public Review |
12/01/17 |
03/06/20 |
| End of Public Review |
01/31/18 |
04/20/20 |
| LADWP Board Hearing Date |
10/13/20 |
|
Public Meeting:
The public meeting to be held during the Draft EIR public review period, originally scheduled for March 26, 2020, has been CANCELLED. All agencies, organizations, and interested parties are invited to submit comments directly to: Los Angeles Department of Water and Power, Attn: James Howe, 111 North Hope Street, Room 1044, Los Angeles, CA 90012 or at [email protected].
De Soto Trunk Line Replacement Project
| Notice Type |
NOP |
| Start of Public Review |
03/26/20 |
| End of Public Review |
04/27/20 |
| LADWP Board Hearing Date |
07/28/20 |
Distribution Station 144 Project
| Notice Type |
IS/MND |
| Start of Public Review |
09/04/08 |
| End of Public Review |
10/06/08 |
| LADWP Board Hearing Date |
01/16/09 |
Eagle Rock Dam Seismic Stability Evaluation Project Exemption
| Notice Type |
NOE |
| Start of Public Review |
07/17/20 |
| End of Public Review |
08/15/20 |
| LADWP Board Hearing Date |
N/A |
Eagle Rock Temporary Treatment Station Exemption
| Notice Type |
NOE |
| Start of Public Review |
05/20/20 |
| End of Public Review |
06/18/20 |
| LADWP Board Hearing Date |
N/A |
East Valley Yard Pavement Replacement Project Exemption
| Notice Type |
NOE |
| Start of Public Review |
07/23/21 |
| End of Public Review |
08/23/21 |
| LADWP Board Hearing Date |
N/A |
Elysian Park-Downtown Water Recycling Projects (EIR)
| Notice Type |
IS/NOP |
DEIR |
| Start of Public Review |
05/09/14 |
03/20/15 |
| End of Public Review |
06/13/14 |
06/26/15 |
| LADWP Board Hearing Date |
|
05/17/16 |
DEIR Documents (March 2015)
Elysian Park-Downtown Water Recycling Projects (MND Documents)
Elysian Reservoir Water Quality Improvement Project
| Notice Type |
NOP/IS |
DEIR |
FEIR |
| Start of Public Review |
06/23/08 |
03/10/11 |
|
| End of Public Review |
07/22/08 |
04/25/11 |
|
| LADWP Board Hearing Date |
04/17/12 |
|
|
LADWP held a public meeting to solicit comments on the adequacy of the Draft Environmental Impact Report on April 13, 2011.
Hard copies of the Draft EIR are available for review at the following libraries:
Lincoln Heights Branch Library
2530 Workman Street
Los Angeles, CA 90031
Chinatown Branch Library
639 North Hill Street
Los Angeles, CA 90012
Cypress Park Branch Library
1150 Cypress Avenue
Los Angeles, CA 90065
Edendale Branch Library
2011 West Sunset Boulevard
Los Angeles, CA 90026
Echo Park Branch Library
1410 West Temple Street
Los Angeles, CA 90026
Silver Lake Branch Library
2411 Glendale Boulevard
Los Angeles, CA 90039
E/M W385R Pumping Test Project
| Notice Type |
NOI/MND |
| Start of Public Review |
09/22/17 |
| End of Public Review |
10/23/17 |
| LADWP Board Hearing Date |
11/28/17 |
Encino Microfiltration Plant Recommissioning Project
| Notice Type |
NOE |
| Start of Public Review |
03/16/21 |
| End of Public Review |
04/15/21 |
| LADWP Board Hearing Date |
N/A |
Fairmont Sedimentation Plant Project
| Notice Type |
NOI/MND |
| Start of Public Review |
04/05/18 |
| End of Public Review |
05/04/18 |
| LADWP Board Hearing Date |
09/05/18 |
| Notice Type |
NOI/MND |
| Start of Public Review |
07/29/21 |
| End of Public Review |
08/30/21 |
| LADWP Board Hearing Date |
11/16/21 |
Fish Slough Staff Gauge Project
| Notice Type |
NOE |
| Start of Public Review |
05/13/22 |
| End of Public Review |
06/20/22 |
| LADWP Board Hearing Date |
N/A |
First Street Trunk Line Project
| Notice Type |
NOE |
| Start of Public Review |
05/13/22 |
| End of Public Review |
06/20/22 |
| LADWP Board Hearing Date |
N/A |
| Notice Type |
NOP |
DEIR |
| Start of Public Review |
01/16/13 |
03/21/14 |
| End of Public Review |
03/01/13 |
05/05/14 |
| LADWP Board Hearing Date |
07/15/14 |
|
A public scoping meeting was held for this project:
February 13, 2013
6:30 p.m. to 8:30 p.m.
Truesdale Training Center
11781 Truesdale Street
Sun Valley, CA 91352
of Draft EIR (March 2014)
Please Note: A public meeting was held to receive public comments regarding the scope, content, and analysis provided in the Draft EIR.
The public meeting was held as follows:
Date: April 23, 2014
Time: 6:30 p.m.
Location: Pacoima City Hall
13520 Van Nuys Boulevard
Pacoima, CA 91331
Garber Street Recycled Water Tank Project
| Notice Type |
NOI/MND |
| Start of Public Review |
08/15/18 |
| End of Public Review |
09/24/18 |
| LADWP Board Hearing Date |
TBD |
Griffith Park South Water Recycling Project
| Notice Type |
IS/MND |
| Start of Public Review |
10/25/13 |
| End of Public Review |
12/02/13 |
| LADWP Board Hearing Date |
03/18/14 |
Response to Comment Letters (February 2014)
Haiwee Power Plant Penstock Replacement Project
| Notice Type |
NOI/MND |
| Start of Public Review |
09/08/16 |
| End of Public Review |
10/27/16 |
| LADWP Board Hearing Date |
12/06/16 |
Hansen Area Water Recycling Project
| Notice Type |
IS/MND |
| Start of Public Review |
01/29/04 |
| End of Public Review |
07/21/04 |
| LADWP Board Hearing Date |
N/A (previously considered 11/01/05) |
Harbor Refineries Recycled Water Pipeline Project
| Notice Type |
FEIR |
DIER |
NOP/IS |
| Start of Public Review |
|
07/23/09 |
12/19/08 |
| End of Public Review |
|
09/08/09 |
01/30/09 |
| LADWP Board Hearing Date |
10/20/09 |
|
|
Haynes Generating Station Units 3 Through 6 Demolition Project
| Notice Type |
NOI/MND |
| Start of Public Review |
06/15/17 |
| End of Public Review |
07/21/17 |
| LADWP Board Hearing Date |
10/17/17 |
Haynes Generating Station Units 5 and 6 Repowering Project
| Notice Type |
DIER |
NOP/IS |
| Start of Public Review |
01/28/10 |
04/16/09 |
| End of Public Review |
03/15/10 |
05/15/09 |
| LADWP Board Hearing Date |
05/04/10 |
|
Haynes Generating Station Unit 8 Recycled Water Cooling System Retrofit Project
| Notice Type |
NOI/MND |
| Start of Public Review |
11/04/21 |
| End of Public Review |
12/10/21 |
| LADWP Board Hearing Date |
02/08/22 |
Headworks Site Development Project
| Notice Type |
NOI / MND |
| Start of Public Review |
04/25/24 |
| End of Public Review |
05/28/24 |
| LADWP Board Hearing Date |
09/10/2024 |
| Notice Type |
NOI/MND |
| Start of Public Review |
01/13/11 |
| End of Public Review |
02/01/11 |
| LADWP Board Hearing Date |
04/16/13 |
Hoover Street District Yard and New Power District Yard Project
| Notice Type |
NOI/MND |
| Start of Public Review |
07/01/21 |
| End of Public Review |
07/31/21 |
| LADWP Board Hearing Date |
03/22/22 |
LAA System Flood Prep & Emergency Response - Southern District
| Notice Type |
NOE |
| Start of Public Review |
03/22/23 |
| End of Public Review |
04/24/23 |
| LADWP Board Hearing Date |
N/A |
LAA System Flood Prep & Emergency Response - Southern District
| Notice Type |
NOE |
| Start of Public Review |
03/16/23 |
| End of Public Review |
04/16/23 |
| LADWP Board Hearing Date |
N/A |
Little Lake Aqueduct Crossover Project
| Notice Type |
NOI/MND |
| Start of Public Review |
11/01/23 |
| End of Public Review |
12/08/23 |
| LADWP Board Hearing Date |
05/14/24 |
Long-Term Routine Maintenance Activities for Waterways in Inyo and Mono Counties
| Notice Type |
NOI/MND |
| Start of Public Review |
12/18/17 |
| End of Public Review |
02/15/18 |
| LADWP Board Hearing Date |
06/18/19 |
| Notice Type |
NOI/MND |
| Start of Public Review |
07/23/09 |
| End of Public Review |
08/24/09 |
| LADWP Board Hearing Date |
10/20/09 |
Los Angeles Groundwater Replenishment Project
| Notice Type |
NOP/IS |
DEIR |
| Start of Public Review |
09/09/13 |
05/12/16 |
| End of Public Review |
10/21/13 |
07/11/16 |
| LADWP Board Hearing Date |
|
12/06/16 |
PUBLIC MEETING: A public meeting was held during the Draft EIR public review period to solicit comments from interested parties on the content of the Draft EIR. The meeting was held on Tuesday, June 14, 2016 at 6:00 p.m., at Sepulveda Garden Center, 16633 West Magnolia Boulevard, Encino, CA 91436.
Public Scoping Period Comment Letters Received (2013)
Los Angeles Reservoir Water Quality Improvement Project (LARWQIP)
| Notice Type |
NOI/MND |
| Start of Public Review |
04/20/12 |
| End of Public Review |
05/21/12 |
| LADWP Board Hearing Date |
08/07/12 |
Maclay Tanks and Reservoir Solar Project
| Notice Type |
IS/MND |
| Start of Public Review |
12/02/10 |
| End of Public Review |
01/07/11 |
| LADWP Board Hearing Date |
N/A |
McCullough-Victorville Lines 1 and 2 Upgrade Project
| Notice Type |
NOE |
NOA |
FEIR |
| Start of Public Review |
04/01/24 |
06/27/24 |
|
| End of Public Review |
05/01/24 |
08/12/24 |
|
| LADWP Board Hearing Date |
N/A |
N/A |
10/22/24 |
Please visit www.ladwp.com/MCC-VIC for more information.
Mid Valley Water Facility
| Notice Type |
NOI/MND |
| Start of Public Review |
09/06/19 |
| End of Public Review |
10/07/19 |
| LADWP Board Hearing Date |
02/11/20 |
Mono Basin Water Rights Licenses Project
| Notice Type |
NOI/MND |
| Start of Public Review |
10/30/20 |
| End of Public Review |
01/06/21 |
| LADWP Board Hearing Date |
04/27/21 |
Mono Gate One Diversion Facility Upgrade Project
| Notice Type |
IS/MND |
| Start of Public Review |
01/15/08 |
| End of Public Review |
02/13/08 |
| LADWP Board Hearing Date |
05/20/08 |
Mulholland Water Pipeline Project
Neenah Pumping Station Turnout Facility
| Notice Type |
IS/MND |
| Start of Public Review |
04/28/05 |
| End of Public Review |
05/27/05 |
| LADWP Board Hearing Date |
04/18/06 |
Nilind Solar Energy Project
| Notice Type |
IS |
| Start of Public Review |
TBD |
| End of Public Review |
TBD |
| LADWP Board Hearing Date |
08/04/09 |
North Haiwee Dam Seismic Improvement Project
| Notice Type |
NOP |
DEIR |
| Start of Public Review |
10/30/14 |
09/21/17 |
| End of Public Review |
12/15/14 |
11/06/17 |
| LADWP Board Hearing Date |
TBD |
|
PUBLIC MEETING:
A public meeting was held during the Draft EIR/EA public review period to solicit comments from interested parties on the content of the Draft EIR/EA. The meeting took place on Wednesday, October 11, 2017 from 6:00 pm to 8:00pm, at Statham Hall (Lone Pine Senior Center), 138 Jackson Street, Lone Pine, CA 93545.
North Haiwee Geotechnical Investigation
| Notice Type |
MND |
| Start of Public Review |
09/16/03 |
| End of Public Review |
10/16/03 |
| LADWP Board Hearing Date |
07/06/04 |
North Hollywood Central Groundwater Treatment Action
| Notice Type |
NOI/MND |
| Start of Public Review |
08/02/18 |
| End of Public Review |
10/04/18 |
| LADWP Board Hearing Date |
12/11/18 |
Public Meeting
LADWP will hold a public meeting regarding the proposed project on August 16, 2018 at 6:00 p.m. The meeting will be held at the following location.
Valley Plaza Library
12311 Vanowen Street
North Hollywood, CA 91605
North Hollywood Chlorination Stations and NHOU2IR West Treatment Project
| Notice Type |
NOI/MND |
| Start of Public Review |
10/27/22 |
| End of Public Review |
12/02/22 |
| LADWP Board Hearing Date |
03/14/23 |
North Hollywood West Well Field Water Treatment Project
| Notice Type |
NOI/MND |
| Start of Public Review |
12/07/16 |
| End of Public Review |
03/29/17 |
| LADWP Board Hearing Date |
08/01/17 |
PUBLIC MEETING: A public meeting was held during the IS/MND public review period to solicit comments from interested parties. The meeting was held on Wednesday, January 4, 2017 at 6:00 p.m. at the Valley Plaza Library, 12311 Vanowen Street, North Hollywood, CA 91605. A second meeting was also held on Wednesday, February 8, 2017 at 6:00 p.m. at the same location.
Operation NEXT and Hyperion 2035 Program (PEIR)
| Notice Type |
NOP |
Draft PEIR |
| Start of Public Review |
03/15/21 |
TBD |
| End of Public Review |
04/14/21 |
TBD |
| LADWP Board Hearing Date |
|
|
Update: The NOP Public Comment Period for Operation Next is closed and the project has been revised as "Pure Water Los Angeles." Please check back at www.ladwp.com/envnotices for a new NOP and subsequent documents under that title starting Summer 2025. You may also get more information about the CEQA for Pure Water at Pure Water Los Angeles CEQA beginning in summer 2025.
Owens Dry Lake Phase 7a Dust Control Measures Project
| Notice Type |
NOP/IS |
DEIR |
FEIR |
| Start of Public Review |
05/25/11 |
02/01/13 |
|
| End of Public Review |
06/24/11 |
03/18/13 |
|
| LADWP Board Hearing Date |
|
|
05/24/13 |
Owens Gorge Flow Restoration Project
| Notice Type |
NOI/MND |
| Start of Public Review |
09/22/14 |
| End of Public Review |
10/23/14 |
| LADWP Board Hearing Date |
12/02/14 |
Owens Lake Dust Mitigation Program - Phase 9/10 Project
| Notice Type |
NOP |
DEIR |
| Start of Public Review |
07/16/14 |
02/12/15 |
| End of Public Review |
08/18/14 |
03/30/15 |
| LADWP Board Hearing Date |
06/02/15 |
|
Owens Lake Master Project
| Notice Type |
NOP |
DEIR |
| Start of Public Review |
06/23/15 |
TBD |
| End of Public Review |
08/07/15 |
TBD |
| LADWP Board Hearing Date |
TBD |
|
Public Scoping Meetings were held on July 15, 2015 from 3:00-5:00 p.m. at the LADWP Office, 300 Mandich Street, Bishop, CA 93514 and on July 22, 2015 from 6:00-8:00 p.m. at Statham Hall, 138 Jackson Street, Lone Pine, CA 93545.
Please see the July 15, 2015 PDF presentation of the Public Scoping Meetings for the Owens Lake Master Project.
Owens Lake Revised Moat and Row Dust Control Measures Plan
| Notice Type |
FSEIR |
SEIR |
NOP/IS |
| Start of Public Review |
|
06/08/09 |
12/16/08 |
| End of Public Review |
|
07/22/09 |
01/13/09 |
| LADWP Board Hearing Date |
09/15/09 |
|
|
Owens Lake Solar Demonstration Project
| Notice Type |
IS/MND |
| Start of Public Review |
03/28/13 |
| End of Public Review |
04/29/13 |
| LADWP Board Hearing Date |
06/19/13 |
Owens River Gorge Restoration Project
| Notice Type |
NOP/IS |
| Start of Public Review |
02/25/10 |
| End of Public Review |
03/26/10 |
| LADWP Board Hearing Date |
TBD |
Owens Valley Land Management Plan
| Notice Type |
IS/MND |
| Start of Public Review |
03/23/10 |
| End of Public Review |
04/26/10 |
| LADWP Board Hearing Date |
06/01/10 |
| Notice Type |
NOP |
| Start of Public Review |
06/28/18 |
| End of Public Review |
07/30/18 |
| LADWP Board Hearing Date |
11/06/18 |
Parthenia Trunk Line
| Notice Type |
IS/MND |
| Start of Public Review |
08/28/03 |
| End of Public Review |
09/26/03 |
| LADWP Board Hearing Date |
11/18/03 |
Path 46 Transmission Line Clearance Project
| Notice Type |
NOI/MND |
| Start of Public Review |
10/07/19 |
| End of Public Review |
11/07/19 |
| LADWP Board Hearing Date |
02/25/20 |
Pine Tree Wind Development Project
| Notice Type |
EA/FEIR |
DEIR/EA |
NOP |
| Start of Public Review |
|
11/22/04 |
04/19/04 |
| End of Public Review |
|
01/07/05 |
05/18/04 |
| LADWP Board Hearing Date |
04/19/05 |
|
|
| Notice Type |
NOE |
| Start of Public Review |
03/19/21 |
| End of Public Review |
04/19/21 |
| LADWP Board Hearing Date |
N/A |
Power Plant Line 1 and Power Plant 2 Transmission Line Project
| Notice Type |
NOP |
DEIR |
| Start of Public Review |
01/24/18 |
05/03/19 |
| End of Public Review |
03/09/18 |
06/17/19 |
| LADWP Board Hearing Date |
TBD |
09/10/19 |
PUBLIC MEETING:
A public scoping meeting will be held to share information regarding the proposed project and environmental review process and to receive written comments about the scope and content of the environmental analysis to be address in the EIR. The meeting will be held on Wednesday, February 7, 2018, at 6:00 pm, at The Centre - Sycamore Rooms A/B, 20880 Centre Pointe Parkway, Santa Clarita, CA 91351.
PP1 Bank Stabilization Project Exemption
| Notice Type |
NOE |
| Start of Public Review |
06/06/20 |
| End of Public Review |
07/06/20 |
| LADWP Board Hearing Date |
N/A |
Proposed Groundwater Treatment Action for Tujunga Well Field
| Notice Type |
NOI/MND |
| Start of Public Review |
07/12/18 |
| End of Public Review |
09/12/18 |
| LADWP Board Hearing Date |
01/22/19 |
Redmont Pump Station and Tank Project
| Notice Type |
NOP |
DEIR |
FEIR |
| Start of Public Review |
03/17/16 |
07/21/16 |
|
| End of Public Review |
04/16/16 |
09/22/16 |
|
| LADWP Board Hearing Date |
N/A |
N/A |
11/15/16 |
PUBLIC MEETING: A public meeting was held on Thursday, August 11, 2016 at 6:00 p.m., 7747 Foothill Boulevard, Tujunga, CA 91042.
Redmont Pump Station Replacement Project
| Notice Type |
IS/MND |
| Start of Public Review |
01/15/08 |
| End of Public Review |
02/13/08 |
| LADWP Board Hearing Date |
07/02/08 |
Replacement of Well 076 in the Bairs-Georges Wellfield
| Notice Type |
IS/MND |
| Start of Public Review |
08/08/11 |
| End of Public Review |
09/07/11 |
| LADWP Board Hearing Date |
10/04/11 |
Replacement of Well W390 in the Lone Pine Wellfield
| Notice Type |
IS/MND |
| Start of Public Review |
08/08/11 |
| End of Public Review |
09/07/11 |
| LADWP Board Hearing Date |
10/04/11 |
Reseda Boulevard Pipeline Project
| Notice Type |
IS/MND |
| Start of Public Review |
02/13/14 |
| End of Public Review |
03/14/14 |
| LADWP Board Hearing Date |
03/06/14 |
River Supply Conduit Improvement – Lower Reach
| Notice Type |
FEIR |
DEIR |
NOP/IS |
| Start of Public Review |
|
05/06/05 |
08/25/04 |
| End of Public Review |
|
06/20/05 |
09/23/04 |
| LADWP Board Hearing Date |
02/21/06 |
|
|
River Supply Conduit Improvement – Upper Reach
| Notice Type |
FEIR |
DEIR |
NOP/IS |
| Start of Public Review |
03/31/08 |
01/25/07 |
|
| End of Public Review |
05/15/08 |
02/26/07 |
|
| LADWP Board Hearing Date |
09/16/08 |
|
|
Rosamond Switching Station Project
| Notice Type |
NOI/MND |
| Start of Public Review |
04/23/20 |
| End of Public Review |
05/25/20 |
| LADWP Board Hearing Date |
08/11/20 |
Roscoe Trunk Line Replacement Project
| Notice Type |
NOI/MND |
| Start of Public Review |
03/24/22 |
| End of Public Review |
04/22/22 |
| LADWP Board Hearing Date |
07/12/22 |
San Fernando Basin Groundwater Injection Well Pilot Study
| Notice Type |
NOE |
| Start of Public Review |
04/19/24 |
| End of Public Review |
05/24/24 |
| LADWP Board Hearing Date |
N/A |
San Fernando Valley Water Recycling Project
| Notice Type |
IS/MND |
| Start of Public Review |
11/16/12 |
| End of Public Review |
12/17/12 |
| LADWP Board Hearing Date |
11/07/13 |
Santa Ynez Water Quality Improvement Project
| Notice Type |
MND |
| Start of Public Review |
10/30/03 |
| End of Public Review |
12/01/03 |
| LADWP Board Hearing Date |
07/20/04 |
Scattergood Generating Station Unit 3 Repowering Project
| Notice Type |
NOP/IS |
NOA/DEIR |
| Start of Public Review |
01/27/11 |
05/17/12 |
| End of Public Review |
02/25/11 |
07/02/12 |
| LADWP Board Hearing Date |
|
09/18/12 |
Scattergood-Olympic Transmission Line
| Notice Type |
NOP |
NOA/DEIR |
| Start of Public Review |
10/12/10 |
03/22/12 |
| End of Public Review |
11/12/10 |
05/07/12 |
| LADWP Board Hearing Date |
|
07/17/12 |
Sepulveda Basin Water Recycling Project
| Notice Type |
MND |
| Start of Public Review |
11/20/03 |
| End of Public Review |
12/19/03 |
| LADWP Board Hearing Date |
03/02/04 |
Silver Lake and Ivanhoe Reservoirs Aeration and Recirculation Project
| Notice Type |
NOI/MND |
| Start of Public Review |
05/07/20 |
| End of Public Review |
06/05/20 |
| LADWP Board Hearing Date |
08/25/20 |
Silver Lake Reservoir Complex Storage Replacement Project
| Notice Type |
FEIR |
DEIR |
NOP/IS |
| Start of Public Review |
|
08/04/05 |
08/25/03 |
| End of Public Review |
|
09/19/05 |
09/24/03 |
| LADWP Board Hearing Date |
05/16/06 |
|
|
Spunky Canyon Creek Flume Maintenance Project Exemption
| Notice Type |
NOE |
| Start of Public Review |
08/06/20 |
| End of Public Review |
09/07/20 |
| LADWP Board Hearing Date |
N/A |
St. Andrews Place Demolition Project
| Notice Type |
NOI/MND |
| Start of Public Review |
11/16/20 |
| End of Public Review |
12/18/20 |
| LADWP Board Hearing Date |
04/13/21 |
Stormwater Capture Parks Program
| Notice Type |
NOI/MND |
| Start of Public Review |
01/07/21 |
| End of Public Review |
02/08/21 |
| LADWP Board Hearing Date |
09/14/21 |
Sylmar Ground Return Replacement Project
| Notice Type |
IS/NOP |
DEIR |
Recirculated DEIR |
| Start of Public Review |
09/24/10 |
05/15/14 |
03/10/16 |
| End of Public Review |
10/25/10 |
09/02/14 |
04/25/16 |
| LADWP Board Hearing Date |
TBD |
TBD |
08/02/16 |
The documents below are for the first (2014) release of the DEIR and are here for reference only.
Draft Environmental Impact Report Volume 1:
Draft Environmental Impact Report Volume II:
Taylor Yard Water Recycling Project
| Notice Type |
IS/MND |
| Start of Public Review |
02/23/07 |
| End of Public Review |
03/26/07 |
| LADWP Board Hearing Date |
07/17/07 |
Terminal Hill Tunnel and Shaft Project
| Notice Type |
IS/MND |
| Start of Public Review |
09/11/08 |
| End of Public Review |
10/10/08 |
| LADWP Board Hearing Date |
01/16/09 |
Toluca-Hollywood Line 1 Upgrade Project
| Notice Type |
NOE |
| Start of Public Review |
12/15/22 |
| End of Public Review |
03/10/23 |
| LADWP Board Hearing Date |
07/11/23 |
Topham Trunk Line Replacement Project
| Notice Type |
NOE |
| Start of Public Review |
06/15/23 |
| End of Public Review |
07/15/23 |
| LADWP Board Hearing Date |
09/12/23 |
Tujunga Spreading Grounds Enhancement Project
| Notice Type |
IS/NOP |
DEIR |
| Start of Public Review |
02/13/12 |
08/16/12 |
| End of Public Review |
03/15/12 |
10/31/12 |
| LADWP Board Hearing Date |
|
05/24/13 |
Upper Stone Canyon Reservoir Water Quality Improvement Project
| Notice Type |
NOP/IS |
DEIR |
FEIR |
| Start of Public Review |
06/23/08 |
06/09/11 |
|
| End of Public Review |
07/22/08 |
07/25/11 |
|
| LADWP Board Hearing Date |
02/07/12 |
|
|
LADWP held a public meeting to solicit comments on the Draft Environmental Impact Report on Tuesday, July 12, 2011 at the American Jewish University. See below to view the presentation from that meeting.
Valley Generating Station Demolition Project (Units 1-4 and Associated Structures)
| Notice Type |
NOI/MND |
| Start of Public Review |
01/07/21 |
| End of Public Review |
02/08/21 |
| LADWP Board Hearing Date |
04/27/21 |
Van Norman Bypass Reservoir Solar Project
| Notice Type |
IS/ND |
| Start of Public Review |
07/22/10 |
| End of Public Review |
08/10/10 |
| LADWP Board Hearing Date |
11/02/10 |
Van Norman Complex Routine Operation and Maintenance Program
| Notice Type |
NOP |
| Start of Public Review |
11/07/19 |
| End of Public Review |
12/23/19 |
| LADWP Board Hearing Date |
10/12/21 |
Victory Pump Station Replacement Project
| Notice Type |
NOI/MND |
| Start of Public Review |
11/30/22 |
| End of Public Review |
01/06/23 |
| LADWP Board Hearing Date |
TBD |
Well V817 Rose Valley Pipeline Installation Project
| Notice Type |
IS/MND |
| Start of Public Review |
08/05/13 |
| End of Public Review |
09/04/13 |
| LADWP Board Hearing Date |
08/04/15 |
West LA District HQ Building
| Notice Type |
IS/MND |
| Start of Public Review |
02/03/05 |
| End of Public Review |
03/04/05 |
| LADWP Board Hearing Date |
05/03/05 |
West Los Angeles District Yard Project
| Notice Type |
NOI/MND |
| Start of Public Review |
06/25/20 |
| End of Public Review |
07/25/20 |
| LADWP Board Hearing Date |
05/24/22 |
Western District Yard Renovation Project
| Notice Type |
IMND |
| Start of Public Review |
06/17/04 |
| End of Public Review |
07/19/04 |
| LADWP Board Hearing Date |
10/12/04 |
Western Trunk Line Project
| Notice Type |
NOI/MND |
| Start of Public Review |
01/23/20 |
| End of Public Review |
02/24/20 |
| LADWP Board Hearing Date |
07/28/20 |
Woodman Avenue Multi-Beneficial Stormwater Capture Pilot Project
| Notice Type |
IS/MND |
| Start of Public Review |
12/13/10 |
| End of Public Review |
01/14/11 |
| LADWP Board Hearing Date |
02/01/11 |